FutureStates
Agency/Sector | Assignment | Project Description |
---|---|---|
UK Government, DFID | Environmental Impact Assessment ~ airport | Assessed potential social and environmental impact of the development of Blackburne airport in Montserrat as part of a wider series of studies (engineering, financial and tourism) for the detailed feasibility of airport development: evaluation of the effects of the development on the Farm River, natural drainage patterns, coastal regime, local flora and fauna, archaeological interest, noise and dust, and on the introduction of pests and diseases. The evaluation indicated that the major impacts of the project were likely to be on land-take, landscape, the Farm River, heritage, certain local communities, transportation and infrastructure. Compensation packages were developed for properties. A sensitive design of the proposed airport built elements was recommended to maintain the infrastructure in keeping with the local architecture. The natural alignment of the Farm River was retained with the use of culverts. A local sugar mill (including, chimney, boiling house and plantation house) was recommended for relocation and an Amerindian village was recommended for excavation prior to construction. A local community would need to be relocated for safety reasons. |